ByteDance, a leading technology company, is constructing the Volcanic Cloud Taixing Compute Power Center in Datong, Shanxi.

This massive project spans 537.1 mu (approximately 35.8 hectares), featuring 10 data center buildings, 2 comprehensive buildings, and 2 substations (110kV and 220kV). It can accommodate 600,000 high-performance servers, with D1-D4 data center buildings already under construction.

In the first phase, D1 has 592 row head cabinets, while the second phase includes D2 and D3 with 432 row head cabinets.

The total amount for this project is more than 1,000,000 CNY.

Project Name: ByteDance Volcanic Cloud Taixing Compute Power Center

Project Location: China

Contact Us
  • Project Overview
  • Related Solutions and Products

    Solutions:
    Products:  
    Energy Efficiency Management ADW300 AC Wireless IoT Energy Meter ADL400 AC Three Phase Energy Meter
    IoT Energy Management Solution
    AKH-0.66/K 5A Current Transformer Acrel IoT-EMS Platform


    Customer Pain Points

    • Massive Data Processing Demand: As a tech giant, ByteDance requires extensive computational resources to support its vast data processing needs.
    • High Operational Efficiency Requirement: The data center must operate efficiently to ensure smooth business operations.
    • Energy Consumption Management: Managing energy consumption is critical to reduce operational costs and environmental impact.
    • Reliability and Stability: The data center needs to maintain high reliability and stability to avoid disruptions.

    Acrel Solution

    AMC100 Series Monitoring Devices: Acrel provides the AMC100 series data center monitoring devices, which offer real-time monitoring of electrical parameters, switch statuses, and lightning arrester conditions for A+B dual incoming lines and multiple outgoing lines. These devices can monitor up to 192 outgoing circuits and feature a compact design with high integration.
    Touch Screen Interface: The monitoring system includes a touch screen interface that displays detailed monitoring data and parameters. It allows operators to visualize the operational status of the data center's power distribution system.
    Customized Monitoring Solution: The AMC100 series can be customized to meet specific monitoring requirements, including AC and DC systems. It supports various measurement functions such as voltage, current, power, energy, and harmonic analysis. The system can also be equipped with accessories like current transformers and shunt modules.

    Details

    Project Outcomes & Benefits

    • Enhanced Monitoring Capability: The AMC100 series devices enable comprehensive monitoring of the data center's power distribution system, improving the ability to detect and address potential issues promptly.
    • Improved Energy Efficiency: By monitoring energy consumption in real-time, the data center can optimize its energy usage and reduce costs.
    • Increased Reliability: The monitoring system helps ensure the reliable operation of the data center by promptly alerting operators to any abnormalities.
    • Cost-Effectiveness: The efficient monitoring and management capabilities of the AMC100 series contribute to reduced operational and maintenance costs.
    • Scalability: The solution supports scalability, allowing the data center to expand its monitoring capabilities as needed in the future.