Energy Monitoring for Distributed Battery-Swapping Stations
Home / Projects / Commercial Buildings / Energy Monitoring for Distributed Battery-Swapping Stations

Energy Monitoring for Distributed Battery-Swapping Stations

Title tag: Energy Monitoring for 50+ Battery-Swapping Stations in Uganda | Acrel Case Study

Meta description: How Acrel metered a distributed e-motorcycle battery-swapping network in Uganda: one 4G-connected ADW300 meter on each station's incoming feeder, NTC temperature monitoring on cable lugs, and a single IoT EMS platform for the whole network.

H1: Metering 50+ distributed battery-swapping stations without a single site visit

Standfirst: One 4G-connected ADW300 meter in each street cabinet turns every swap station into a metered, alarm-aware node of a single cloud platform — from Kampala to the last district on the network.

Client: GOGO, e-mobility operator  |  Location: Uganda  |  Scope: station metering plus cloud platform  |  Status: live, scaling

Key figures strip

  • 1 — meter per station, on the incoming feeder; one device covers the whole site's billing base.
  • 4G — direct uplink from the meter: no gateway, no extra power point, no second device on the rail.
  • 24 h — worst case before a station running off its normal consumption pattern is flagged.
  • 50+ per year — new stations planned on the same architecture, with no re-engineering per site.
Contact Us
  • Project Overview
  • 2  An electric business whose electricity was invisible

    GOGO runs electric motorcycles in Uganda and keeps them on the road with a network of battery-swapping cabinets. A rider arrives with a depleted pack, swaps it for a charged one and leaves in under two minutes. Commercially, the whole model rests on electricity — but per site, nobody could see how much was consumed, when the peak fell, or whether a cabinet was quietly drawing current at three in the morning.

    The network made that harder than usual. Stations sit in different districts, in street-side enclosures with a few hundred millimetres of spare rail space, fed by grids whose quality and availability vary from block to block. Battery charging is also the least forgiving load in the building: a loose lug or a corroded joint does not fail gracefully.

    What the operator needed was not a report generator. It was an instrumentation layer that could be dropped into a cabinet in an afternoon, survive patchy connectivity, and still hand headquarters one comparable number per site.

    What the network required

    1. Accurate metering per station — a defensible kWh figure for every site, independent of who operates it and how often the cabinet is serviced.
    2. A link that needs nothing from the building — the meter carries its own SIM, so data leaves the cabinet whether or not a landlord will give up a network port.
    3. Status in, control out — digital inputs for door and smoke contacts, digital outputs to cut a feeder or trip an alarm, inside the same device that meters.
    4. Temperature where it matters — cable lugs and busbar joints, alarmed before they become a thermal event, not after.
    5. One platform, several roles — headquarters sees the portfolio, the regional office sees its cluster, the site operator sees one cabinet.
    6. Architecture that repeats — adding station fifty-one must cost a meter and a binding step, not a redesign.

     

    Figure 1.  A swap point at the end of the working day. Compact, street-side cabinets, fed from whatever the local grid provides — the three constraints that shaped the metering design.

    3  The design: one meter on the feeder, one cloud — nothing in between

    The system is deliberately shallow. Each cabinet gets a single ADW300 four-quadrant meter on its incoming feeder, downstream of the main breaker, with three split-core current transformers clamped onto the existing cable and two NTC probes wired into the meter's temperature channel. Nothing is re-terminated, so the retrofit does not interrupt service beyond the time it takes to open the cabinet.

    From there the chain is one hop. The meter carries its own 4G module and SIM and pushes frames straight to the Acrel IoT EMS platform. There is no gateway to power, no spare rail to find, and no second device that can fail on its own. When coverage drops, the meter keeps integrating: energy registers continue to accumulate, so an outage shows up as a gap in real-time data that reconciles on reconnect, not as missing kWh in the settlement.

     

    Figure 2.  System topology. The meter takes its measurements at the feeder and its uplink from its own 4G module; the NTC probes wired into its temperature channel watch the cable lug and the busbar joint.

    Why the meter sits on the incoming feeder rather than on the chargers

    1. One device produces the whole site's energy base — the number the operator actually settles against, without summing branch readings.
    2. Compact cabinets rarely have rail space or room for a current transformer on every charger feeder. A single feeder-level installation fits in the space that already exists.
    3. The boundary stays open. If the operator later bills riders per kWh, branch meters are added on the charger feeders and the main device stays where it is.

    Why there is no gateway on site

    1. One less device. The cabinet has no spare rail and no spare socket; every added box is another thing to power, protect and replace.
    2. One less failure mode. With no local aggregation link, there is nothing between the meter and the platform to break — the meter retries and buffers on its own.
    3. The data shape is unchanged. Platform-side, a site is still one device with one set of channels and one set of alarm rules.

    4  What goes into each cabinet

    Quantities are per station; the bill of material is identical across the network so that a spare kit can be carried on a service run instead of ordered per site.

    Table 1.  Bill of material per swapping station (typical configuration)

    Item

    Model

    Qty

    Role in the system

    IoT energy meter

    ADW300-4G / ADW300W

    1

    Station-level kWh, demand and harmonics at class 0.5S; 2 DO / 4 DI; NTC input; integrated 4G uplink

    Current transformer

    AKH-0.66/K split-core

    3

    Clamped onto the incoming cable; ratio selected to the feeder rating so the meter reads full-scale load

    Temperature probe

    NTC, 2 m lead

    2

    Incoming cable lug and busbar joint; wired straight into the meter's temperature channel

    4G SIM and data plan

    Operator or Acrel APN

    1

    Roughly 15 MB per meter per month at a five-minute reporting interval

    Platform tenant

    Acrel IoT EMS

    1

    Multi-site supervision, role-based access, alarms, history and API for settlement

     

     

    Figure 3.  ADW300: DIN-rail meter with split-core CT input, 2 DO / 4 DI, an NTC channel and the 4G module behind the antenna lead. One device per cabinet, no companion gateway.

     

    Figure 4.  The retrofit in place: ADW300 on the DIN rail, three split-core CTs clamped on the incoming cable, no re-termination and no additional panel.

    5  Station level or charger level? Where to put the boundary

    This is the decision that determines what the data can be used for later. Metering the incoming feeder answers “how much energy did this site consume”; metering each charger bay answers “who consumed it”. Most networks start with the first and add the second only where money changes hands at the bay.

    Configuration A — one meter on the incoming feeder (deployed here)

    • What you get: whole-site kWh, peak demand, load profile, load anomalies, cost allocation per station.
    • Devices: ADW300-4G, three split-core CTs and NTC probes, installed in the existing cabinet.
    • Best for: multi-site visibility, O&M prioritisation, energy-cost benchmarking, demand monitoring.
    • Limit: cannot separate charger consumption from lighting, air conditioning or losses.

    Configuration B — branch meters on each charger bay (next step)

    • What you get: per-bay consumption, per-session settlement, charger efficiency, idle-load detection.
    • Devices: keep the ADW300 as the site total; add ADL400 on each bay, or an AMC16 multi-circuit meter where several bays share one feeder.
    • Best for: per-kWh rider billing, revenue reconciliation, catching a charger that idles at no output.
    • Limit: needs rail space and a CT per branch; the cabinet layout has to allow for it at design stage.

    Rule of thumb: if the operator sells kilometres or unlimited packs, station-level metering is enough. If the operator sells kWh, meter at the bay as well — and keep the station total as the reconciliation reference that keeps both sets of numbers honest.

    6  What changed on the operator's side

    Figures below cover the first six months of operation and are reported per site and per portfolio.

    Maintenance — first-line diagnosis moved to the platform

    Routine inspection visits fell from two per site per month to one. A technician now travels only when the data says a part is actually needed, which matters when the sites are hours apart.

    Safety — temperature alarms before failure, not after

    23 joint-temperature alarms were raised in the first six months, each traced to a specific probe on a specific lug, so the response was a torque wrench rather than a fire extinguisher.

    Energy — a baseline that did not exist before

    Every station now has a normal range for its consumption and demand. Off-pattern sites are flagged within 24 hours instead of being found at the next invoice.

    Commissioning — a new station is live in under half an hour

    Bind the meter to the tenant, assign it to a region, apply the alarm rules: 25 minutes per site, no site visit for configuration. That is what makes 50 stations a year an operational routine rather than a project.

    Commercial — data that can be settled against

    Metered consumption feeds the operator's own systems through the platform API, so per-kWh pricing and rider billing are reconciled against the same device that measured them.

    Resilience — coverage, not a construction project

    Where a district's 4G is thin, the meter simply stores frames until the link returns. Nothing on site changes, no gateway is trucked out, and the totals reconcile when the site reconnects.

     

    Figure 5.  The operator's own tenant in Acrel IoT EMS: project groups and meters on the map, device health split into normal, offline and alarmed, today's energy and carbon figures, and an alarm list naming the circuit and the event.

    7  Why the same layout travels

    The Ugandan network is not a special case, and the design does not depend on it. Distributed swap networks in Kenya, Rwanda, Nigeria and Southeast Asia face the same four conditions: many small sites, uncertain connectivity, no room for equipment, and a thermal risk that sits next to a customer.

    The same meter family covers the adjacent use cases an operator usually meets next: EV charging hubs where bay-level billing is required, telecom tower sites where a multi-circuit meter replaces a row of single meters, and commercial buildings where the incoming feeder is metered before sub-distribution.

    Where a market requires regulated billing, MID and UL variants of the same platform are available, and the platform can run on Acrel's cloud or on the operator's own server when data residency is a condition of the contract.

    How a station gets commissioned

    • Step 1 — Cabinet survey: feeder rating, rail space, CT ratio and the 4G coverage actually present at that address.
    • Step 2 — Retrofit: meter and CTs installed on the existing cable, probes landed on the meter, no re-termination.
    • Step 3 — Link check: SIM activation, APN, uplink and first kWh frame confirmed on the platform.
    • Step 4 — Binding: site created in the tenant, assigned to a region, alarm rules applied, users granted access.

     

    Figure 6.  Battery cabinets are the least forgiving load on the site: continuous charging, high current at the joints, and a customer standing next to it.

    8  Questions operators ask about the same network

    Q1  Does one meter really cover a whole swap station?

    For station-level accounting, yes. The ADW300 measures the incoming feeder, so it captures chargers, battery racks, lighting and air conditioning in one figure. If you need to bill riders per kWh or benchmark individual chargers, add branch meters on the charger feeders and keep the incoming meter as the reconciliation total.

    Q2  What happens when a site has no reliable internet?

    Buffering lives in the meter rather than in a gateway. Energy registers keep integrating while the link is down, frames are retried with a timestamp, and the platform reconciles the cumulative readings when the site reconnects. A late frame is never mistaken for zero consumption.

    Q3  Is a 4G SIM per meter expensive to run?

    At a five-minute reporting interval a meter moves roughly 15 MB a month. If the operator prefers, the SIMs can sit on a private APN with a fixed IP pool, or on a local carrier plan — the meter only needs an outbound MQTT connection.

    Q4  Can it be retrofitted without shutting the station down?

    In most cabinets the work is done on a planned outage of a few minutes: open the cabinet, clamp the split-core CTs onto the existing feeder cable, land the NTC probes, commission the meter. No cable is cut and no new panel is added, which is what keeps a 50-site rollout practical.

    Q5  How is overheating actually detected?

    Two NTC probes per cabinet feed the meter's temperature channel: one on the incoming cable lug, one on the busbar joint — the points that heat first when a connection loosens. Each channel has its own threshold, and the alarm names the site and the channel rather than just reporting high temperature.

    Q6  Can the data go into our billing or rider app?

    Yes. The platform exposes Modbus-TCP and MQTT for SCADA-style integration and an HTTP API for application use. In this project the metered kWh feeds the operator's own settlement, so a rider's session and the site total are traceable to the same device.

    Q7  Cloud or on-premise, and what about certification?

    Either. Acrel IoT EMS runs as a hosted service or on a server inside the operator's own network when data residency is required. The meter family is CE and IEC compliant, and MID or UL variants are available where a market requires them for billing.

    9  Closing call to action

    Headline: Planning a swap network and need a metering layer that survives it?

    Body: Send us the feeder rating, the cabinet photo and the 4G coverage you have at each site. We will come back with a configuration, a bill of material and a commissioning sequence — not a catalogue.

    Buttons: Download the ADW300 datasheet  /  Book a 20-minute technical call





Acrel Co., Ltd.